Duxbury Logo Duxbury Water Image Duxbury   Duxbury
Address
Duxbury
Duxbury Duxbury Duxbury
  :. Navigation
  :. Case Studies - Bonded Store - Car Park
  :. Let us Call You
    Home
    About Us
    Our Services
    Mentoring
    Case Studies
    Links
    Contact Us
Bobby, XHTML 1.0, CSS, ICRA

Association for Project Management - Corporate Member

Business Directory

Attract the right results with Businessmagnet

Bonded Store - Car Park

Duxbury Projects were requested to manage a £685k project to clear an area of a Client’s site and create a hard-standing car park to allow the Client to hold and control the movement of approximately 350 bonded vehicles prior to shipment to dealers.

Duxbury Projects responsibilities included the management of;

  • Demolition of numerous small structures, including air raid shelters.
  • Excavation to formation depth (c650mm) and handling of contaminated ground material, not known at the time of contract commencement.
  • Installation of new drainage system for the area to integrate with the site outfall, and capable of handling flash flood conditions as predicted in a separate report.
  • Installation of a new area lighting scheme.
  • Construction of new formation capable of HGV operations.

Despite the discovery of a significant volume of contaminated ground, the site was remediated and completed on budget, with appropriate changes to the design of works.

Delay due to the discovery, and subsequent management of disposal of the contaminated ground as special waste material, was contained to 2 weeks, although 50% of the site available for occupation on schedule.

Name
Company
Telephone Number